Nuclear Power Plant Borssele faced an unexpected challenge when a critical current transformer in its generator failed. ELEQ swiftly responded with a team of experts to diagnose and repair the transformer.
Eandis is the biggest energy company in Belgium. As they wanted to know if the maximum capacity was reached in their sub-stations they were ….
For a major roll-out of fiberglass KPN wanted to use new distribution cabinets. To keep the cabinets as compact as possible, a regular ..
Bakker Sliedrecht (PON) needed for the project W2W Damen current transformers for the low voltage distribution panels. Those distribution panels will be ….
The transition from a fossil energy-based central energy system to a sustainable decentralized system requires a lot from the electricity network.